What if I told you that your Bronco might still be "In Production" on May 17th, with no estimated date of completion, and at least another 4 weeks of train time? I would be prepared to take delivery late July \ August. Hopefully things flow better then, but be prepared to "Hang in there."7/14/20 reservation. Same build as you with the exception High instead of Lux. Back in December 21, I dropped Tow and Mic top. I was scheduled shortly thereafter. 3/15/22 build date, with VIN assigned.
Hang in there!